Project Inspection Status
Track inspection status for specific projects
Automation Status
Idle
Emails Processed: 0
Select Project
Connection Settings
Project Codes
The following project codes are currently configured:
| Location | Project Code |
|---|---|
| Willoughby | S21206801-Willoughby |
| St leonards | S21206501-St Leonards |
| Kensington | S23203302-kensington |
Project codes are shared with the Inspection Automations feature.
How It Works
This feature helps you track the inspection status for a specific project:
- Select a project from the dropdown menu.
- Choose a time period to search for relevant emails.
- The system will search for emails related to the selected project.
- For each email found, it will extract information about:
- Structural Elements (from email subject)
- Whether inspection reports are saved in Dropbox
- Whether rectifications are required
- Whether rectifications were received
- Whether work was approved
- Inspector name
- Folder path in Dropbox
- Processing date and email date
- The information will be added to a separate spreadsheet for tracking.
Note: Make sure your spreadsheet has the following columns:
- Column A: Structural Elements
- Column B: Inspection Report Saved
- Column C: Rectification Required
- Column D: Rectification Received
- Column E: Approved?
- Column F: Inspector
- Column G: Folder Directions
- Column H: Date Processed
- Column I: (blank column)
- Column J: Email Date
Automation Logs
No logs yet. Run the automation to see logs.